How a CNG Kit Is Installed

Follow each step of a CNG conversion and see where every component is fitted in your car. Rotate, zoom and pan the model at any step.

The installation at a glance

  1. Step 01

    Vehicle Assessment

    We check the car, its engine and its boot space to plan where each CNG component will be fitted.

  2. Step 02

    Mount the Bracket

    A cylinder cradle is bolted through the boot floor, with reinforcement plates underneath.

  3. Step 03

    Fit the Cylinder

    The cylinder is lowered into the cradle and strapped down, and the valve is fitted to it.

  4. Step 04

    Route the High-Pressure Line

    A steel line runs from the cylinder valve along the underbody to the engine bay, clamped away from heat.

  5. Step 05

    Install the Filling Receptacle

    The refuelling connection is mounted in the engine bay and joined to the high-pressure line.

  6. Step 06

    Mount the Pressure Reducer

    The reducer is fitted near the engine, fed with high-pressure gas and connected to the coolant.

  7. Step 07

    Fit the Injection System

    The gas filter, injector rail and manifold nozzles are fitted and joined with low-pressure hose.

  8. Step 08

    Connect the Electronics

    The CNG ECU, sensors and changeover switch are wired into the car’s original engine management.

  9. Step 09

    Fill & Leak Test

    The system is filled through the receptacle to around 200 bar. Every joint is checked while the pressure holds steady.

  10. Step 10

    Running on CNG

    With the valve open, gas flows to the reducer, drops to low pressure and is injected into the engine. The car is road-tested and handed over.